Home Service & Support Technical Specs In the field Sheep Jetter
News Presentations Photo album Tag Reader
RACEWELL - Super Sheep Handler - installation

In the field...

Drafting Crush Weighing Handling Sheep Flow Installation Dimensions

INSTALLATION AND TRAINING

Installation

An installation service is available and will be included in the quotation.

Training

Included in the cost of installation is one day of training in the use of :

  • Racewell Super Sheep Handler
  • Indicator
    • Set up
    • Drafting
    • Files
    • Recording
    • Computer interface
The installation and training service is optional, but highly recommended.

SYSTEM REQUIREMENTS

  • Air compressor minimum 15 cf. (To be supplied by purchaser)
    • Operating pressure between 90 and 130 psi.
  • 12 Volt battery or 240 volt mains
    • Easily connected to motor vehicle or motor bike battery
  • Relatively flat surface, gradient no greater than 3 degrees
    • Concrete base is ideal but not essential

INSTALLATION

A 3 Way draft unit installed on concrete.

It is recommended a solid and level base be prepared for the installation of a Racewell System.

This ensures accurate weighing and trouble free drafting.

Contact us:
Harrington Agricultural Products PO Box 160, Wallan Victoria 3756 AUSTRALIA
Fax: (03) 5791492 Phone: 04 0533 0702 Email: info@harringtonag.com.au